© 2011 Gunning Plumbing
GUNNING PLUMBING TURNED THIS TIRED AND MOULDY BATHROOM INTO A CLEAN AND SMART SPACE WITH PERIOD CHARM
THIS CLOAKROOM NEEDED A COMPLETE MAKEOVER, INCLUDING A NEW TILED FLOOR AND THE ADDITION OF A WASH BASIN
NEW TILED FLOOR AND THE ADDITION OF A WASH BASIN
AN EXAMPLE OF ANDREW’S NEAT PIPEWORK, VERY IMPORTANT WITH THIS BOILER ON SHOW
NEW TILED FLOOR AND THE ADDITION OF A WASH BASIN
THIS LARGE CAVERSHAM PROPERTY REQUIRED 17 NEW RADIATORS, AND 2 OLD BOILERS WERE REMOVED. A NEW BOILER, WATER SOFTENER, BOOSTED MAINS WATER, & 300 LITRES OF HOT WATER WERE INSTALLED IN THE GARDEN ANNEXE.
NEW TILED FLOOR AND THE ADDITION OF A WASH BASIN